Resin-bound is often called resin-bound gravel, and the name is fair: it is small stone, mixed with a clear resin and trowelled flat. So the real choice is between gravel that is loose and gravel that is held in place. That one difference drives almost everything below, from cost and upkeep to who can get across the drive easily.
Resin-bound vs gravel at a glance
| Loose gravel | Resin-bound | |
|---|---|---|
| Installed cost | £40-£100 per m² | £40-£70 per m² on a sound base; roughly £65-£115 per m² with a new one |
| Running cost | Top-ups of £200-£500 every 2 to 3 years | A brush and the occasional wash |
| Stone stays put? | No. It migrates without an edge restraint | Yes, every stone is bound in |
| Drains? | Yes | Yes, if the base under it drains too |
| Planning on a front garden | Not needed: permeable | Not needed: permeable |
| Wheelchairs and pushchairs | Hard going in loose stone | Firm and smooth |
| Steep drives | Not suitable on a steep slope | Over 1 in 20, may not suit a permeable build |
| Weeds | Kept down by a membrane underneath | No joints for weeds to root in |
| Security | Crunches underfoot | Quiet |
| Lifespan | 15 years or more, with top-ups | About 15 to 25 years |
Cost: gravel is cheaper on day one
A gravel drive costs £40-£100 per m² with the dig-out, a compacted Type 1 sub-base, a weed membrane, edging and the stone all included. The low end is a small, level, easy site. A resin-bound drive costs £40-£70 per m² laid over a base that is already sound, and the published range for a typical 60m² two-car drive is £3,500-£5,500. If the old surface is broken and a new base has to go in, add £25-£45 per m².
On a full new build, then, gravel is clearly cheaper to lay. The gap narrows in two cases. If you already have a sound tarmac or concrete drive, resin goes over it and the dig-out drops out of the job. And if you count the upkeep, gravel at £200-£500 every two to three years is three to five top-ups in a decade, roughly £600-£2,500 on top of the build. A stabilising grid for £10-£30 per m² extra cuts those top-ups to every three to five years. Every surface is ranked on the same basis in our page on the cheapest driveway options.
Upkeep: raking, migration and weeds
Gravel moves. Without an edge restraint it will spread onto the lawn, the path and the pavement, and car wheels push it into waves and bare patches that need raking back. It finds its way into the house on shoes and into the road. A strip of block paving or tarmac at the entrance, which the government guidance suggests, cuts the loss at the gate, and a plastic grid under the stone stops most of the movement. Even then, it needs topping up at intervals.
Weeds come up through gravel from below and seed into it from above. A geotextile membrane under the sub-base helps keep the first lot down; windblown seed in the stone is a job for the hoe or the weedkiller every season.
A resin-bound drive has no loose stone and no joints for weeds to root in. Upkeep is a stiff brush and a wash now and again, which our page on how to clean a resin driveway covers.
Drainage, permeability and planning (SuDS)
Both surfaces are permeable, so on drainage and planning they are level. In England, the government guidance says you do not need planning permission for a new or replacement driveway of any size that uses permeable surfacing, and it names gravel as one. Resin-bound lets water through the same way. The rule that catches people is for impermeable surfaces: cover more than five square metres of front garden with one that drains to the road, and you need permission. That is a tarmac and concrete problem, not a gravel or resin one. Outside England the rules may differ, so in Wales or Scotland ask the council.
The catch nobody mentions
One more limit on both: the government guidance says a drive steeper than 1 in 20 may not suit permeable surfacing, and it lists loose gravel as not suitable for steeply sloping drives at all.
Wheelchairs, pushchairs, walking aids and heels
This is the difference that matters most to some households, and it is written down in the building regulations. Approved Document M, which sets the standard for the approach to a new home, defines a suitable ground surface as "firm, even, smooth enough to be wheeled over, is not covered with loose laid materials such as gravel and shingle, and has a maximum crossfall of 1:40." The government's own front garden guidance lists loose gravel as "Not suitable for wheel-chairs", and the Department for Transport's Inclusive Mobility standard says loose gravel should not be used on paths.
In plain terms, wheels sink and slew in loose stone, and so do pushchairs, wheelie bins, walking frames, sticks and narrow heels. Resin-bound is firm, even and smooth enough to wheel over, with the grip of the stone still in the surface. If anyone in the house uses a wheelchair or a walking aid, or will in future, that alone usually settles it. Our page on resin-bound paths covers taking the same surface up the garden and to the door.
Tired of raking the gravel back?
Tell us the size of the drive and what sits under the stone. We will tell you whether the base can stay and price a resin-bound surface on top of it.
Can you pour resin over an existing gravel drive?
No. Resin-bound needs a stable, bound base: sound tarmac, sound concrete, or a new open-graded tarmac or concrete layer laid for it. Loose gravel moves under the trowel and under the car, so the resin layer would crack and break up. A few specialist permeable systems can be laid thicker over a compacted crushed-stone base for paths and light traffic (one UK maker specifies a minimum 35mm), but a standard resin-bound drive is laid at around 15mm for foot traffic and 18mm for cars, and those depths only work on a solid base.
What usually happens is that the gravel is lifted, the sub-base underneath is checked and topped up or replaced, and a bound layer goes on before the resin. Our page on what resin can be laid over goes through every base.
Lifespan
A well-built gravel drive lasts 15 years or more before it needs a major refresh, as long as it is topped up along the way. A resin-bound drive typically lasts around 15 to 25 years. In both cases the sub-base decides it: gravel on a thin base ruts, and resin on a poor base cracks. There is more on what makes a resin drive last in how long a resin driveway lasts.
If you stay with gravel, get these right
- Size: 10 to 18mm, or 20mm, for a driveway. The smaller 6 to 10mm stone suits footpaths but scatters under tyres.
- Shape: angular stone, which locks together better than rounded pea shingle and is steadier underfoot.
- Depth: a thin layer, around 25 to 50mm by the UK sources, over a properly compacted sub-base. Deeper loose stone is harder to walk and drive on, not better.
- Edges and a grid: an edge restraint all round, and a grid if the budget runs to it.
Gravel is a good drive when it suits the house: cheap to lay, free-draining, easy to do yourself, and noisy enough that burglars dislike it. It is a poor one on a slope, for wheels, or for anyone who does not want to rake.
So which should you choose?
Choose gravel when:
- The upfront budget is tight and the drive is flat.
- You are happy to rake and top it up every few years.
- Nobody in the house relies on wheels to get to the door.
Choose a resin-bound driveway when:
- You want the look of stone without stone on the lawn and in the hall.
- Wheelchairs, pushchairs, walking aids or bins cross it every day.
- You already have a sound tarmac or concrete base it can go over.
Want the stone without the raking?
Give us the rough size and the colour of gravel you like. We will put a written price on a resin-bound drive in a matching blend.
About this page
Who wrote this
The Obsidian Resin team. We lay resin-bound driveways anywhere in Great Britain, and many of them replace a gravel drive, so this is the comparison we talk through most often.
Where the facts come from
Costs are published UK market ranges, not our prices. The planning and accessibility points come from the government's guidance on permeable surfacing of front gardens, Approved Document M and the Department for Transport's Inclusive Mobility. Build depths come from UK resin manufacturers' data sheets.
Our honest position
We lay resin, so we would rather you chose it. Gravel is still the cheaper drive to lay, and the table says so.
Frequently asked questions
- Can you just pour resin over gravel?
- No. Resin-bound needs a stable bound base such as sound tarmac or concrete. Loose gravel moves, so the resin cracks and breaks up. The gravel is lifted, the sub-base checked, and a bound layer laid first.
- What goes under resin bound gravel?
- A solid base: sound existing tarmac or concrete, or for a permeable new build, an open-graded sub-base such as Type 3 topped with porous tarmac or concrete. The government example uses about 150mm of sub-base over a geotextile.
- Do weeds grow through resin bound gravel?
- Not up through a properly laid surface: the stone is bound solid with no joints for roots to get into. Loose gravel lets weeds through and lets windblown seed settle in the stone.
- Is resin cheaper than gravel?
- No. Gravel is £40-£100 per m² fully built; resin-bound is £40-£70 per m² over a sound base and more with a new one. Gravel needs top-ups of £200-£500 every two to three years, which narrows the gap over time.
- What type of gravel is best for a driveway?
- Angular stone around 10 to 20mm, laid thin over a compacted sub-base, with an edge restraint and ideally a stabilising grid. Smaller 6 to 10mm stone suits footpaths, not drives.
- Is gravel or resin better for wheelchairs?
- Resin-bound. Building regulations define a suitable approach surface as firm, even and not covered with loose gravel or shingle, and government guidance lists loose gravel as not suitable for wheelchairs.
- What are the pros and cons of a resin bound gravel driveway?
- Pros: the stone stays put, it drains, it is firm enough for wheels, and upkeep is a brush and a wash. Cons: it costs more than loose gravel, it needs a sound base, and it must be laid in dry weather.
- Can I buy a DIY resin bound gravel kit?
- Yes, from specialist stockists. A pedestrian-grade trade kit covers roughly 3.5 to 4m² at 15mm deep, so a drive takes many. Our page on a DIY resin driveway sets out what goes wrong.