Seamless commercial floors that earn their keep.
Resin floors for trade kitchens, food prep, washrooms, retail and commercial units anywhere in Great Britain. Seamless and impervious, coved up the wall, laid to the slip rating and heat the room actually sees, and phased around your hours.
What you get
Meets the food hygiene wording
Impervious, non-absorbent and washable, which is what food hygiene law asks of a food-room floor.
Slip rated, wet
Textured systems that publish a wet pendulum value of 40 or more, inside the HSE low slip band.
Built for the heat
From a thin coating for a dry store to a 9mm polyurethane screed that takes steam cleaning and boiling spills.
Back in use fast
Fast-cure systems take foot traffic in about an hour, so a shop can be done overnight.
How it works
Tell us the details
Tell us what the room does: what gets spilt, how hot, how it is cleaned, and when it can close.
Quote in writing
A single written price covering the lot, straight to your inbox.
New floor laid
Prep, detailing at drains and walls, pour and cure, phased around your hours.
Want a firm number? Send the size and your postcode and we come back with one written figure, not a range.
Pick the system by what the room does
The Resin Flooring Association (FeRFA) sorts resin floors into eight types by thickness, from a 150 micron seal up to a heavy-duty trowelled screed over 6mm. On a commercial job the decision comes down to three questions: how wet does it get, how hot, and how is it cleaned? A dry stockroom or office corridor is well served by a thin coating. A busy kitchen is not.
The data sheets show why. A water-based epoxy coating, at 45 to 75 microns a coat, publishes a wet pendulum test value (PTV) above 25 and takes sustained heat only to 60°C. A polyurethane screed from another UK maker publishes a wet PTV above 40 and is rated to under 80°C at 6mm and under 120°C at 9mm. Same family of materials, very different floors.
Commercial kitchens: thickness is the heat rating
The HSE says people working in kitchens are more likely to be injured through slips and trips than by anything else, and kitchens are also where floors meet boiling water, fat and steam. That is the job polyurethane cement screeds are made for, and on these systems the heat rating rises with thickness. One UK system takes spills to 70°C at 6mm and, at 9mm, sustained heat from -40°C to 105°C, spills to 120°C, and steam cleaning. Another publishes -40°C to 60°C at 6mm and -40°C to 120°C at 8mm, with steam cleaning only at 8mm.
Grip has to match the spill as well. HSE guidance asks for surface roughness of at least 20 microns where the contaminant is water, 45 for milk and 70 for olive oil, so a fryer line needs a coarser texture than a pot wash. For a floor that needs grip without the heavy screed, a quartz or anti-slip build covers it. Our kitchen resin flooring page covers the domestic side.
Hygiene: what the law asks of the floor, and the details that deliver it
Food hygiene law, retained in the UK, says food-room floors must use "impervious, non-absorbent, washable and non-toxic materials" and, where appropriate, "allow adequate surface drainage". A seamless resin floor meets the first part by itself. The second part is in the detail work, and that is where commercial floors succeed or fail.
At every edge, drain, gutter and doorway the screed is locked into an anchor groove cut into the slab, twice the screed's thickness. A coved skirting carries the floor up the wall, one maker's guidance being a 38mm radius and 100mm high, so there is no corner for dirt to sit in; plasterboard is not a suitable backing for it. Falls to drains have to be built into the slab first, at no more than 2 to 2.5%, because the screed itself cannot form them. HSE kitchen guidance adds drainage channels and drip trays at tilting kettles and bratt pans.
Downtime: getting the unit back in use
On the data sheets at 20°C, a polyurethane kitchen screed takes light traffic after about 24 hours, full traffic after 48, and full chemical cure in about 7 days. At 10°C those stretch to about 36 hours, 72 hours and 10 days, and the slab can sit up to 10°C colder than the air, so a cold unit in winter needs heating before the floor goes down. Cold rooms are brought down to temperature no faster than 5°C per 24 hours once the floor is in.
Where a shop or kitchen can only close overnight, a fast-cure MMA system at 4mm to 5mm takes foot traffic in about an hour and full traffic in two to three hours at 20°C. Where the space is customer-facing, our showroom resin flooring leans towards a finish that looks the part. Comparing options? Our guides to resin flooring versus polished concrete and what a resin floor costs are a good place to start.
The slab underneath
Damp in the slab is the first limit every resin system sets. FeRFA puts the limit at 75% relative humidity in the slab for epoxy and 85% for polyurethane, and the kitchen screeds above hold to 75% measured to BS 8203 unless a damp-proof membrane or special primer goes in first. So the slab is checked for moisture first, then shot-blasted or ground back to sound concrete to the maker's method. For forklift and plant traffic, see our industrial resin flooring page.
Which commercial floor for which room
Figures from FeRFA and UK manufacturers' data sheets. Slip values are pendulum test values (PTV); the HSE treats 36 and above as low slip potential.
| Room | System | Thickness | Slip and heat | Back in use (20°C) |
|---|---|---|---|---|
| Dry store, office, corridor | Rolled epoxy coating | Microns, not millimetres | Wet PTV above 25; sustained heat to 60°C | Light traffic about 24 to 48 hours |
| Busy kitchen, food prep | Polyurethane screed | 6mm | Wet PTV above 40; heat to around 60 to 80°C by system | Light traffic about 24 hours |
| Kitchen with steam cleaning, boiling spills | Polyurethane screed | 8mm to 9mm | Heat to 105°C sustained, 120°C spills on one system | Full chemical cure about 7 days |
| Shop or kitchen that can only close overnight | Fast-cure MMA | 4mm to 5mm | Ask for the wet PTV | About 1 hour to walk on |
Where we work
Anywhere in Great Britain
We lay commercial floors anywhere in Great Britain, and plan the work around your opening hours so the unit is shut for as little time as possible. For heavier plant and forklift traffic, see our industrial resin flooring page.
Resin in your city: Bristol, Newcastle, Glasgow, Manchester, London, Birmingham, Leeds, Liverpool, Sheffield, Leicester, Nottingham, Coventry, Derby, Plymouth, Bradford.
Common questions
- Is resin flooring suitable for a commercial kitchen?
- Yes, and food hygiene law describes it: floors must be impervious, non-absorbent and washable. For a hot kitchen the usual system is a polyurethane screed, laid at 8mm to 9mm where it will be steam cleaned or take boiling spills.
- How slip-resistant is it?
- It depends on the texture. Textured commercial screeds publish wet pendulum values above 40, in the HSE low slip band; a smooth thin coating may only manage the moderate band when wet. HSE guidance asks for more roughness for oil than for water.
- How thick is a commercial resin floor?
- From a few hundred microns for a rolled coating in a dry area to 6mm to 9mm for a kitchen polyurethane screed. The thicker screeds carry the higher heat ratings.
- Can you work overnight or at weekends?
- Often, yes. A fast-cure MMA system takes foot traffic in about an hour at 20°C, so a shop or kitchen can close one night. A polyurethane screed needs about 24 hours before light traffic and about 7 days to full chemical cure.
- Do you cove the floor up the walls?
- In food areas, yes. A coved skirting carries the resin up the wall so there is no corner to collect dirt, and every edge and drain is locked into a groove cut in the slab. Coving needs a solid backing; plasterboard will not do.
- How much does commercial resin flooring cost?
- There is no flat rate per square metre. The cost comes down to the system the room needs, the floor area, the state of the slab and the detailing at walls and drains. We quote one fixed price for the whole job in writing after we have seen it, and that is the number on the invoice. Our resin flooring cost guide breaks down what drives the number.
Get your quote.
Tell us about the space and we will come back with a written quote for the whole job.