Resin driveways in Bradford
In Bradford you cannot hire your own firm to drop the kerb. Bradford Council builds every residential crossing itself, charging £1,995 for a standard one plus a £120 application fee, and it wants at least 6 metres of hardstanding behind it with no water running onto the road. For now it is not taking new applications, so this is the time to get the drive itself right. We lay resin-bound, which rain soaks through, at one fixed written price for the whole drive.
Bradford in numbers
| What | Bradford | What it means for your floor or drive |
|---|---|---|
| New kerb applications | Temporarily paused | The council says high demand has stopped new vehicle crossover applications for now, and updates will go on its dropped kerb page. |
| Who builds the kerb | The council's Highway Delivery Unit only | You cannot use your own contractor. The build is done within 10 weeks of paying in full. |
| Standard crossing | £1,995 (extension £1,596) | On top of a £120 application fee, £60 of which comes back if you are refused. The 2026-27 fees list gives £135, so confirm it when you apply. |
| Hardstanding behind the kerb | 6 m deep, parking space 2.75 m wide | Measured at right angles to the road across the whole width of the crossing. No part of a parked car may overhang the pavement. |
| Sight line either side | Nothing over 0.6 m in a 2 m splay | A front wall, hedge or pier taller than that beside the opening may have to come down. Plan the wall work with the drive. |
| Slope of the crossing | 1 in 12 at most, 1 in 20 recommended | No surface water may run from your drive onto the road, so the drive needs its own drainage. |
| Conservation areas | 60, and no Article 4 on drives | None of the district's six Article 4 directions covers hard surfaces or front walls. In Saltaire the walls are part of the listed buildings. |
| Terraced homes | 33.0% (England and Wales 23.2%) | A third of Bradford homes are terraces. Measure the 6 metres before anything else. |
Tell us the size of the space and your postcode, and we send one written price for the whole job.
The council builds every Bradford kerb, and the list is shut for now
Bradford Council, which covers Keighley, Shipley, Bingley, Ilkley and Silsden as well as the city, does not let anyone else build a residential dropped kerb. Its policy says the council constructs all vehicle crossings internally, and its dropped kerb page says plainly that you cannot use your own contractor. Opening up the highway without permission is an offence under the Highways Act 1980, and driving across a footway or verge without a proper crossing is an offence too.
The route is short. You apply with the property owner's consent, a sketch with measurements, a photo of the area and planning permission if you need it, and pay the £120 fee within 14 days or the application is deleted. A Traffic Officer checks the site and the council decides within up to 28 working days. If you are refused, £60 comes back. If you are approved, you have 56 days to pay for the build in full, £1,995 for a standard crossing, and the council's Highway Delivery Unit builds it within 10 weeks of payment. The finished crossing becomes the council's to maintain, and it must not be driven on for 24 hours.
Two things to know before you plan around that. The council's 2026-27 fees list gives the domestic application fee as £135, against £120 on the dropped kerb page, so check the figure when you pay. And the dropped kerb page currently says that, due to high demand, the council is temporarily unable to accept applications for new vehicle crossovers, with updates to follow on that page. Even in a normal year, applications are only taken from January to November, and winter builds can slip with the weather.
While the list is shut, the parts you control are the frontage and the drive. Measure against the rules below, check if your road is an A, B or C road, sort the wall and the drainage, and the drive can be ready when applications reopen.
- You cannot assume permission will be given. Refusals are given for too little frontage, poor visibility, being too close to street furniture, junctions, crossings, trees or signals, or already having a crossing.
- The decision is final, but you can ask for a review within 21 days, and the council answers within 20 working days. After that, the Local Government and Social Care Ombudsman.
- A crossing used without permission gets a letter giving 28 days to apply or reinstate the verge, after which the council can build the crossing and send you the bill.
Six metres deep, and a low wall either side of the gap
The council's crossing terms are more demanding than most. The hardstanding behind the kerb has to be at least 6 metres deep, measured at right angles to the road across the whole width of the crossing, and the parking space at least 2.75 metres wide. No part of a parked car may sit over the pavement or the crossing, and you drive straight in, not at an angle.
Then there is the sight line. A 45 degree splay over 2 metres either side of the opening must be clear of anything over 0.6 metres high, so drivers can see people on the pavement. On a lot of Bradford frontages that means the stone wall or hedge next to the gap comes down to 0.6 metres or less, so price the wall work into the drive rather than finding out at the inspection.
- A standard single crossing is 3 flat kerbs and 2 tapered ones, 5 flat kerbs at most. The crossing itself must be 4.5 to 6.4 metres wide.
- Full frontage crossings are not allowed, and you get one crossing per property unless the house has historically had two entrances.
- Keep 15 metres from a junction, 1 metre from a mature tree and 2 metres from a new one. Trees with preservation orders will not be removed.
- Lighting columns may be moved, at extra cost. The crossing cannot clash with bus stops, poles or benches.
- Gates must not open onto the footway or the road.
- If two neighbours share a crossing, both apply and the cost is split.
A 1 in 12 limit and no water onto the road
The crossing can be no steeper than 1 in 12, and the council recommends 1 in 20. On a frontage that rises or falls to the road, the levels of the drive have to meet the crossing at a gradient the council will accept, so set the levels before the resin goes down.
The same terms say no surface water may flow from the property onto the public highway, and adequate drainage must collect it. A resin-bound driveway lets rain soak through the surface into the base, which is most of the answer. The rest depends on what is underneath and where the water goes next, so we check the base and the falls before we quote, and where the ground will not take the water we plan a channel, border or soakaway into the price.
What Bradford's householder guide says about paving and gravel
Bradford's Householder Supplementary Planning Document discourages non-permeable drives and patios that drain into public sewers, and says that in most cases a permeable surface, or running the water to a permeable area in the garden, is possible. Where neither a permeable surface nor natural drainage can be used, it asks for a written justification. It also discourages paving the whole front garden and parking more than one car in front of a house, because of what it does to the street.
Gravel is permeable, but the council discourages it for driveways and paths. Its reasons: disabled, elderly and young people can find it hard to use, stones spill onto the pavement and road, and loose stones can give opportunities for anti-social behaviour and crime. Resin-bound gives the drainage without the loose stone, which is the difference our guides on resin against gravel and resin-bound against resin-bonded go into. Resin-bonded scatters loose stone over a sealed coat, so it fails on both counts.
On planning, the national rule for houses applies: a new hard surface over 5 square metres in front of the house needs no application if it is porous or drains to a lawn or border, and resin-bound is porous. You need planning permission for a new access onto an A, B or C road, and Bradford asks for it before the kerb application. A new front wall, gate or fence over 1 metre next to a road needs permission too. If the drive is also a public right of way, the council's Rights of Way Team has to approve any change of surface. Our planning permission guide covers the national rules.
Sixty conservation areas and the listed walls of Saltaire
The Bradford district has 60 conservation areas, from Little Germany and Manningham to Haworth, Ilkley and Bingley. Inside one, knocking down most of an unlisted wall or structure needs planning permission for relevant demolition, the council normally expects traditional natural materials in new work, and you must tell the council's Trees Team six weeks before any work to a tree. If the drive means cutting back roots or branches, that notice comes first.
Bradford has six Article 4 directions, and none of them touches a drive or a front wall: four cover dormer windows and stone painting in Little Horton and Manningham, one covers dormers and painting at Apsley Crescent, and the Saltaire direction covers alterations and extensions to the houses. So in a Bradford conservation area, a porous drive on a house still falls under the national rule, and the wall height and demolition controls are what to check. Pick a resin colour that sits with the stone. Our guide to resin driveway colours and styles shows the range.
Saltaire is the exception that matters. Every house in the old Article 4 area was listed in 1984, and the council's guidance says the boundary walls and outhouses count as part of each listed building. Replacing a gate or rebuilding a wall needs listed building consent, and a wall must not be lowered or demolished without consent. Any resin work in a Saltaire yard starts with a conversation with the council's conservation team.
Boxing Day 2015, clay ground and old drains
Bradford Council is the lead local flood authority, and its flood strategy records what heavy rain does here. In summer 2002 some places had two months of rain in two days, and surface water flooded properties and shut roads. Over Christmas and Boxing Day 2015 the Aire, Wharfe, Worth and Silsden Beck all surcharged at once for the first time on record, and more than 1,000 homes and businesses flooded, with the cost to homes put at £18 million. Most of that was river water, but the strategy lists surface water among the causes, and Storm Ciara later dropped more than a month's rain on parts of West Yorkshire in around 18 hours.
Two details shape a drive. The strategy describes the district's geology as a clay stratum, and the council's 2023 flood assessment says some older sewer and highway drains have less capacity than new ones. There are no designated critical drainage areas, so no special rule applies, but the council's own drainage order of preference puts water into the ground first. On clay, a porous surface still needs a base and an outlet that can take the water, which is why what resin can be laid over matters as much as the finish.
Terraces, landlords and the garage at the back
A third of Bradford homes are terraces (33.0%, against 23.2% across England and Wales), and only 14.7% are detached. Semis are the biggest group at 36.7%. Measure a terraced or semi frontage against the 6 metres first, because no surface fixes one that falls short.
Nearly a quarter of households rent privately (23.0%) and 14.6% rent from a social landlord. The council asks for the property owner's consent with every application, so get it in writing before the drive is planned. More than a quarter of households have no car or van (27.6%, against 23.3%).
If the front will not take a drive, the resin job may be behind the house. Bradford's householder guide asks for 5.6 metres between garage doors and the back of the footpath, and for garages off back streets to sit far enough back that open doors do not block the road. We lay garage floor resin and workshop resin flooring, and for a business unit, commercial resin flooring. A commercial or non-domestic crossing is £3,370 on the council's 2026-27 fees list, so price the access and the floor together.
Common questions
- How much is a dropped kerb in Bradford?
- Bradford Council charges £1,995 to build a standard crossing and £1,596 for an extension, plus a £120 application fee (£135 on its 2026-27 fees list). If you are refused, £60 of the fee comes back.
- Can I use my own contractor for a dropped kerb in Bradford?
- No. The council builds every residential crossing through its own Highway Delivery Unit, within 10 weeks of you paying in full. We lay the drive behind it.
- Is Bradford Council taking dropped kerb applications?
- Not new ones at the moment. Its dropped kerb page says that, due to high demand, it is temporarily unable to accept applications for new vehicle crossovers, and that updates will be posted there. Normally it takes them from January to November.
- How deep does my front garden need to be for a drive in Bradford?
- The council wants at least 6 metres of hardstanding behind the kerb, measured at right angles to the road, and a parking space at least 2.75 metres wide, with no part of the car over the pavement.
- Will I have to lower my front wall?
- Possibly. Bradford wants a 45 degree splay over 2 metres either side of the crossing kept clear of anything over 0.6 metres high, so a taller wall, pier or hedge beside the opening may have to come down. In Saltaire the walls are listed, so ask the conservation team first.
- Can I have a gravel drive in Bradford?
- Gravel is permeable, but the council's householder guide discourages it for driveways because stones spill onto the pavement and road and it is hard going for disabled, elderly and young people. Resin-bound drains without the loose stone.
- Do I need planning permission for a resin driveway in Bradford?
- Usually not for a house, because resin-bound is porous, and none of Bradford's Article 4 directions covers drives. You do for a new access onto an A, B or C road, which Bradford wants before the kerb application, and for a new front wall or gate over 1 metre. In Saltaire, wall changes need listed building consent. More in do you need planning permission for a resin driveway.
- How much does a resin driveway cost in Bradford?
- It depends on the area, the base and how the ground drains, plus any wall work and the council's charges if you need a kerb. Tell us about the drive and we send one fixed written price for the whole job. Our resin driveway cost guide sets out the market ranges.
Where these figures come from
- Bradford Council: dropped kerbs and crossovers
- Bradford Council: vehicle crossover terms and conditions
- Bradford Council: vehicle crossings policy
- Bradford Council: statutory fees 2026-27
- Bradford Council: Householder Supplementary Planning Document
- Bradford Council: list of conservation areas
- Bradford Council: what is a conservation area?
- Bradford Council: Article 4 directions
- Bradford Council: Saltaire boundary wall design guide
- Bradford Council: Local Flood Risk Management Strategy
- Bradford Council: Level 1 Strategic Flood Risk Assessment, 2023
- Town and Country Planning (General Permitted Development) (England) Order 2015, Part 1 Class F
- General Permitted Development Order 2015, Part 2: gates, walls and means of access
- ONS Census 2021: accommodation type, tenure and car or van availability (Nomis)
Checked November 2026.
What we lay in Bradford: resin-bound driveways, resin-bound paths, patios, garage floors, workshop floors, commercial floors
Other cities: Bristol, Newcastle, Glasgow, Manchester, London, Birmingham, Leeds, Liverpool, Sheffield, Leicester, Nottingham, Coventry, Derby, Plymouth
Get a quote in Bradford.