Resin driveways in Birmingham

In Birmingham the council builds every dropped kerb through its own authorised contractors, and it only says yes to a frontage at least 4.75 metres deep, 2.75 metres wide and no steeper than 1 in 10. Applying costs £125, with a £375 administration fee on top of the works. We lay porous resin-bound drives to those numbers and give one fixed written price for the whole job.

Birmingham in numbers

WhatBirminghamWhat it means for your floor or drive
Dropped kerb application£125, non-refundablePays for the council's desk check and site inspection. A £375 administration fee and the contractor's price for the works come on top.
Who builds the crossingCouncil-authorised contractors onlyA driveway firm that offers to drop the kerb itself is offering an illegal crossing, which the council can remove and bill you for.
Frontage depthAt least 4.75 mMeasured from the back of the pavement to the furthest-out part of the house, retaining walls included. The council cannot vary it.
Crossing width2.75 m for one car, 4.5 m for twoAnything under 2.75 m is refused under any circumstances, so check the gap between gatepost and boundary first.
Steepest drive allowed1 in 10 (10 cm per metre)A frontage that climbs or drops more than that is refused. The falls on a new drive have to be set within it.
Time to build a standard kerbAt least 16 weeks after you payOver 20 weeks if a tree, a street light or utility kit is in the way. The quote itself takes up to 28 working days after the inspection.
Conservation areas29, with Article 4 directions in 11In any of the 29 the dropped kerb itself needs planning permission. In Moseley, St Agnes and Greenfield Road a new front parking area does too.
Surface water flood riskAn estimated 22,900 propertiesThe council's figure, more than anywhere else in the UK outside London. Its flood strategy names paved-over front gardens as a cause.
Households with no car or van31.7% (England and Wales 23.3%)Almost one in three. For those homes the resin job worth doing is a path, a patio or a garage floor.

Tell us the size of the space and your postcode, and we send one written price for the whole job.

Apply first, lay the drive second, kerb last

Only Birmingham City Council can authorise a dropped crossing, and only its authorised contractors may build one. You apply online, pay the £125 application fee by card, and a council officer checks the location at a desk and then on site, measuring and marking up where the crossing would go. If planning permission is needed, get it first, or the application is put on hold.

The council aims to reply to a standard application within 25 days and to send a quote within 28 working days of the inspection. Once the quote letter is dated, you have 2 months to accept and pay in full. Miss that and you reapply, fee and all. There is no right of appeal against a refusal.

The order is the part that catches people out. The council says the driveway must be in place before it builds the kerb. But if the inspection finds utility plant that has to be moved, it advises not to start the drive, or take down a wall, fence or hedge, until its quote arrives. So the safe order in Birmingham is: apply, wait for the inspection and the quote, lay the drive, then let the council's contractor build the crossing. We plan the resin work around that order, so the drive goes down once you know the kerb is coming.

After payment, a standard crossing takes at least 16 weeks, and over 20 weeks where a tree, a street light, a road sign or utility work is involved. The council says those timescales are unlikely to be speeded up. Put together, that is the best part of six months from inspection to a kerb you can drive over, so start the application well before you want the car on the drive.

4.75 metres deep, 2.75 metres wide, 1 in 10 at most

Birmingham's numbers are fixed, and the council says it cannot vary them. The frontage must be at least 4.75 metres from the back of the pavement to the furthest-out part of the property, retaining walls included. One car needs 2.75 metres of width and two cars 4.5 metres. A crossing narrower than 2.75 metres is not approved under any circumstances.

The slope is the rule most front gardens fail on without anyone noticing. The parking area cannot be steeper than 1 in 10, which means no more than 10 cm of rise or fall for every metre. On a built drive the council checks it with an inclinometer, and getting it right is your responsibility. On a frontage that climbs from the pavement, the levels are set in the base before any resin goes down, so the finished drive falls gently and still comes in under the limit.

A few other rules shape the design before the colour does:

  • The crossing has to match the driveway opening. Drive over the pavement beside it and the council treats it as damage to the highway.
  • No part of the car may hang over the pavement, and the crossing itself is not a parking space.
  • Gates must open inwards. Gates that swing over the pavement are an offence under the Highways Act.
  • A second crossing is only considered on a frontage of 12 metres or more, with separate ways in and out.
  • You can apply jointly with a neighbour and share the fee and the quote.

Trees, lamp posts and the things that sink an application

The council rejects a crossing where a healthy, well-established tree is nearby or a tree preservation order applies. A tree near the line of the crossing means a separate assessment by a Tree Officer, which can take 6 weeks or more because the council has to consult on felling a street tree. An application that needs a grass verge removed is likely to be refused under the council's Net Zero commitments.

Street lights, signs, bollards, bins, drainage, speed humps and parking bays can all be moved or changed, but each one is charged on top, and changing yellow lines or a parking bay means amending the Traffic Regulation Order. Equipment more than 450 mm from the edge of the works is unlikely to get in the way. Anything belonging to a utility, such as a BT or Virgin Media box, is yours to arrange and pay for with that company, and BT and Virgin Media need at least 16 weeks of their own.

Busy locations may be refused: near traffic lights with regular queues, at or near roundabouts, inside the zig-zags of a pedestrian crossing, at bus stops or close to a junction. Check the street outside before you pay for a design.

Ownership matters too. The owner applies, or a tenant with the owner's written permission. Council tenants need a letter from their housing officer, housing association tenants from the association, and private tenants from the landlord. With 23.5% of Birmingham households renting socially and 22.6% privately, that letter is often the first thing to sort. If you share an access with neighbours, every owner has to agree in writing.

Where Birmingham wants planning permission for the kerb

Most houses can lay a porous front drive without applying. Nationally, a hard surface over 5 square metres between the house and the road is permitted development if it is porous or drains to a lawn or border, and a single 4.75 by 2.75 metre space is already about 13 square metres. A resin-bound driveway is porous, so it meets that condition. Birmingham's policy is plain that a non-permeable drive over 5 square metres, such as concrete or tarmac without drainage, needs planning permission.

Birmingham then asks for planning permission for the dropped crossing itself in cases where many other councils would not:

  • The property is in any of the city's 29 conservation areas, or is a listed building.
  • It is a flat, a maisonette, or a house in multiple occupation with more than six rooms.
  • The road outside is a classified (main) road.
  • The crossing would go over a grass verge that is not part of the highway.
  • It serves parking bays in front of a commercial property.

Moseley, St Agnes and the other Article 4 areas

Birmingham has 29 conservation areas, from Moseley, Edgbaston and Harborne to Bournville, Kings Norton, Four Oaks and the Jewellery Quarter. In all of them the kerb needs planning permission. In 11 the council has also made Article 4 directions that take away other householder rights: Austin Village, Bournville Village, part of Edgbaston, Greenfield Road, High Street Sutton Coldfield, Moor Pool, Moseley, Old Yardley, Selly Park, Selly Park Avenues and St Agnes.

In St Agnes and Greenfield Road, and in the direction published for Selly Park, the right to lay a hard surface facing the road is removed, along with the right to put up, alter or knock down a front wall, fence or gate. So a resin drive there needs planning permission even though it is porous, and so does the opening in the wall. The council's Moseley guidance says any new parking area in a front or side garden needs permission, that it should be kept to the minimum size with planting kept or added, and that materials should be neutral in tone, with gravel or setts preferred.

Resin is not named in that guidance. If you are in Moseley, keep the area tight, choose a muted, natural-looking resin colour rather than a bright one, and talk to the conservation team before the application goes in. Inside a conservation area the council also builds the crossing in materials that match the street, rather than its usual tarmac.

22,900 properties at risk and clay under the south side

Birmingham City Council is the lead local flood authority for the city, and its surface water plan estimates that more properties are at risk of surface water flooding from severe rain here than anywhere else in the UK outside London: 22,900 in all. Its flood strategy says flash floods are the most common kind, and lists hard paving of front and rear gardens among the causes. The biggest storms in its records flooded the inside of 133 properties on 16 June 2016, 126 on 6 September 2008 and 111 on 14 June 2007, counting only the homes that sent back a survey.

The council also says it is illegal for water to run from a private property across the pavement onto the road, and it wants a permeable drive in place before it builds the kerb. Its own list names porous tarmac or concrete, slabs and block paving. Resin-bound is porous with no loose stone, but it is not on that list, so ask the dropped kerb team to confirm it for your crossing. A loose finish is a different story: the council wants a 0.5 metre strip of solid surfacing at the boundary to hold gravel back, and resin-bonded, with its scattered stone, sits closer to that rule. Our guide to resin-bound versus resin-bonded explains the difference.

Then there is the ground. The council's flood strategy describes a geological fault running north-west to south-east just south of the city centre, with impermeable clay predominantly to the south. Government guidance on front gardens says a permeable drive needs an open graded sub-base such as 4/20 or Type 3, not Type 1 hardcore, and that on clay an overflow to the drains may be needed for heavy rain. So we ask what is down now and how the garden drains before we spec the base, and the price covers the base as well as the surface.

Vans, workshops and resin floors in Birmingham

Semis are the biggest group of homes in Birmingham at 35.6%, above the national 31.5%, and terraces make up 27.8%, so most drives here go in front of an ordinary semi or terrace where every centimetre of the 4.75 metres counts. Almost one household in three (31.7%) has no car or van, against 23.3% across England and Wales, and for those homes the resin job is often a patio, a path or a garage floor.

If the vehicle is a heavy van or a truck, a standard crossing is not enough. The council assesses heavy duty crossings one by one through its engineering team, and driving a heavy vehicle over a standard crossing is treated as damage to the highway. A business with parking bays out front needs planning permission for the crossing and for the hard standing.

Indoors there is no kerb to cross. We lay workshop resin flooring for trade units and home workshops, and commercial resin flooring for shops and showrooms. If a unit wants a forecourt as well, ask for the floor and the outside in one written quote.

Common questions

How much is a dropped kerb in Birmingham?
Birmingham City Council charges a £125 non-refundable application fee, which covers the inspection, and a £375 administration fee if you go ahead. The works themselves are priced for each address and paid in full before construction. Moving trees, street furniture or utility equipment costs extra, and Blue Badge holders may get a discount.
Can my driveway company drop the kerb in Birmingham?
No. Only Birmingham City Council can authorise a dropped crossing, and only its authorised contractors can build it. A kerb dropped any other way is illegal, and the council can remove it and recover the cost from the owner.
How deep does my front garden need to be for a dropped kerb in Birmingham?
At least 4.75 metres from the back of the pavement to the furthest-out part of the house, retaining walls included. The crossing must be at least 2.75 metres wide for one car, or 4.5 metres for two, and the drive no steeper than 1 in 10.
How long does a dropped kerb take in Birmingham?
The council aims to quote within 28 working days of the inspection, then you have 2 months to pay. A standard crossing takes at least 16 weeks from payment, and over 20 weeks if trees, street lights or utility work are involved.
Should the resin drive or the dropped kerb go in first?
The drive, but not before the council has quoted. Birmingham requires the drive to be in place before it builds the kerb, and advises not starting the drive or removing a wall until the quote arrives if utility equipment needs moving.
Do I need planning permission for a resin driveway in Birmingham?
Usually not for a house, because resin-bound is porous. You do in St Agnes, Greenfield Road and the other Article 4 areas that remove the front hard surface right, and Moseley's guidance says any new front parking area needs it. The kerb itself needs planning permission in all 29 conservation areas, for flats, maisonettes, larger HMOs and on classified roads. More in do you need planning permission for a resin driveway.
I rent in Birmingham. Can I get a dropped kerb and a resin drive?
Only with written permission. Council tenants need it from their housing officer, housing association tenants from the association and private tenants from the landlord, before the application goes in.
How much does a resin driveway cost in Birmingham?
It depends on the area, the base underneath, the levels and access, with the council's kerb fees on top if you need a crossing. Tell us about the drive and we send one fixed written price for the whole job. Our resin driveway cost guide explains what drives the number.

Get a quote in Birmingham.

Tell us about the space and we will come back with a written quote for the whole job.