A tough, decorative floor built to take a hammering.
Epoxy quartz flooring: coloured quartz grains broadcast to excess into a resin body coat and sealed, 2mm to 3mm thick, or trowelled as a 4mm to 6mm screed. UK systems test at a wet pendulum value above 40, low slip potential on the HSE scale, for kitchens, changing rooms, washdown bays and busy units.
What you get
Grip that holds wet
Several UK quartz systems publish a wet PTV above 40, comfortably inside the HSE low slip band.
Very hard-wearing
A body coat buried in 3 to 4kg of quartz per square metre, then sealed, so the wear lands on stone.
Easy to clean
Seamless and sealed, so it scrubs down without dirt working into grout lines.
Texture to suit
Finer grains and more seal for easier mopping, coarser grains and less seal for harder grip.
How it works
Tell us the details
Tell us about the use, how wet it gets, what gets spilt, and whether people walk it barefoot.
Quote in writing
One price for the whole job, in writing, agreed before any work starts.
New floor laid
Diamond-grind, prime, lay the body coat, broadcast the quartz to excess, sweep it back and seal.
Want a firm number? Send the size and your postcode and we come back with one written figure, not a range.
How a quartz floor is built
A broadcast quartz floor is what the Resin Flooring Association (FeRFA) calls a multi-layer, or "sandwich", system, typically over 2mm thick. On one UK data sheet the build goes: one or two primer coats at 0.3 to 0.5kg per square metre, a body coat at 0.8kg, quartz thrown in until the coat is buried at 3 to 4kg, then a sealing top coat at 0.6 to 0.9kg once the loose grit has been swept and vacuumed off. The finished floor is nominally 2mm to 3mm.
The heavier option is a trowelled quartz screed: quartz mixed into the resin and laid by hand at 4mm to 6mm, which FeRFA classes as a resin screed. It costs more effort to lay and gives a denser wearing layer, which is why it turns up in wet processing areas and commercial changing rooms. We spec broadcast or trowelled to how hard the floor is going to work. The full sequence is in our guide to how a resin floor is installed.
Slip ratings, and why the seal matters as much as the stone
The HSE judges floors by pendulum test value (PTV). Under 25 is high slip potential, 25 to 35 moderate, and 36 or more low. UK quartz systems publish wet figures above 40: one MMA quartz system shows PTV over 40 both dry and wet, and an epoxy quartz scatter system from another maker shows over 40 wet. A broadcast epoxy quartz is rated R11 on the German ramp test, well clear of R9, the class with the highest slip risk.
The catch is the seal. Every extra coat of clear resin fills the valleys between grains, and one UK maker's own lab table rates its quartz screed with a clear seal only "moderate" wet. So we set grain size and seal thickness together: 0.3 to 0.8mm quartz with a heavier seal for a kitchen that gets mopped daily, 0.7 to 1.2mm with a lighter seal for a ramp or washdown bay. HSE guidance is that greasier, thicker spills need more surface roughness than clean water, which is why a kitchen wants more texture than a bathroom.
Barefoot areas are tested differently, with a softer rubber slider, and shoe-sole results do not carry across. If the floor is a shower area or pool surround, ask for the barefoot figure. For lighter grip on a smoother finish, a fine anti-slip in the topcoat may be all you need.
Epoxy quartz, MMA quartz or a PU screed
Quartz is the dressing; the resin underneath decides how fast it cures and how much heat it takes. Epoxy quartz is the usual choice, but at 20°C it needs about 36 hours before anyone walks on it and about 7 days to full cure. An MMA acrylic quartz system walks after about an hour and takes full traffic in two to three, which is why it suits a shop or kitchen that can only close overnight.
Heat is the other dividing line. A typical epoxy seal is rated to 50°C permanent dry heat, with wet heat to 80°C only occasionally, such as during steam cleaning. In a hot kitchen with boiling spills and fryers, a quartz-dressed polyurethane screed, 5mm to 6mm thick and tolerant of spills to 60°C, is the usual call over a thin epoxy coat. Our commercial resin flooring page covers that decision in more detail, and our industrial page covers plant and forklift sites.
Where quartz earns its place, and where it does not
Quartz is the right floor where the room gets wet and busy at the same time: commercial kitchens, changing rooms and showers, washdown bays, school and healthcare corridors, entrances and plant rooms. It is a common choice in bathrooms and wet rooms that need grip without tiles and grout.
It is the wrong floor for a mirror-smooth look. The texture that grips also holds residue, so a quartz floor wants a scrubber or a stiff brush rather than a quick wipe. Epoxy quartz systems are made for indoor use and, like any epoxy, pale colours yellow under strong sunlight. Underfloor heating combined with heavy point loads can leave imprints in the resin. For a smooth showpiece choose a metallic or solid colour finish; for keeping the texture clear, see our guide to cleaning and maintaining a resin floor.
Quartz systems compared
Three ways to lay a quartz floor, with figures from UK manufacturers' data sheets. Cure times are at 20°C and stretch in a cold room.
| System | Thickness | Slip rating | Walk on it | Best for |
|---|---|---|---|---|
| Broadcast epoxy quartz | 2mm to 3mm | R11, or PTV over 40 wet on some systems | About 36 hours, full cure about 7 days | Changing rooms, wet rooms, corridors, light commercial |
| Trowelled epoxy quartz screed | 4mm to 6mm | Textured; ask for the wet PTV | About 12 to 16 hours, full traffic 2 to 3 days | Wet processing areas, heavy foot traffic |
| MMA acrylic quartz | 4mm to 6mm | PTV over 40 dry and wet | About 1 hour, full traffic 2 to 3 hours | Shops and kitchens that can only close overnight |
| Quartz-dressed PU screed | 5mm to 6mm | PTV over 40 dry | Light traffic about 24 hours | Hot kitchens with boiling spills and steam cleaning |
Where we work
Anywhere in Great Britain
We lay quartz floors anywhere in Great Britain, mostly in kitchens, wet areas and busy commercial spaces. Published UK rates for flake and quartz broadcast systems sit at £45-£95 per m²; that is the market figure, not ours, and we put one fixed price for your floor in writing.
Resin in your city: Bristol, Newcastle, Glasgow, Manchester, London, Birmingham, Leeds, Liverpool, Sheffield, Leicester, Nottingham, Coventry, Derby, Plymouth, Bradford.
Common questions
- How thick is a quartz epoxy floor?
- A broadcast epoxy quartz floor is nominally 2mm to 3mm on UK data sheets. A trowelled quartz screed is thicker, typically 4mm to 6mm. We choose between them on the traffic and how wet the area gets.
- How slip-resistant is a quartz floor?
- Several UK quartz systems publish a wet pendulum value above 40, where the HSE treats 36 and over as low slip potential. The seal thickness matters: too much clear coat over the quartz smooths it and cuts the wet grip.
- What is epoxy quartz flooring?
- A resin floor where coloured quartz grains are broadcast to excess into a wet epoxy body coat, at about 3 to 4kg per square metre, then swept back and sealed. The result is hard, textured and seamless.
- How long before I can use a quartz floor?
- At 20°C, a broadcast epoxy quartz takes foot traffic after about 36 hours and fully cures in about 7 days. An MMA quartz system is walkable after about an hour. Cold rooms stretch every figure.
- Is it hard to clean with the texture?
- It is sealed and seamless, so nothing soaks in, but the texture holds more residue than a smooth gloss. A rotary scrubber or stiff brush with a mild alkaline detergent keeps it clear.
- Is quartz suitable for a commercial kitchen?
- Yes, and the texture suits kitchens because grease needs more roughness to cut through than water does. For hot kitchens with boiling spills and steam cleaning, a quartz-dressed polyurethane screed handles the heat better than a thin epoxy coat.
- Where would you not use it?
- Outdoors, where you want a smooth showpiece look, or where the floor is wiped rather than scrubbed. For those we would point you to metallic or solid colour instead.
Get your quote.
Tell us about the space and we will come back with a written quote for the whole job.